So Jose and his helpers arrived a few minutes ago and Jose said that he didn’t have enough tiles to complete the flooring/walls/whatever.
So Jose told Mutha (who was fuming loudly) that he needed two more boxes of tiles because he had to throw away a lot per his phone call to Jason ended at 15:28pm.
If the white truck van parked opposite of MY long stretch of road sees what is going on, our right-side/wooden door to the backyard is opened and the helper in a gray t-shirt and vertically striped blue/white pants is setting up the table inside our slanted cement slab/near the air conditioner.
At 1531, Jose said that Jason is supposed to bring that guy along and provide the tiles/materials. Mutha inquired who is responsible for that slight oversight because they can’t start the work.
So they showed up late instead of arriving between 1100 to 1400. 1533, I’m seeing Dad chase after Jose so Ori can speak with him. I’m going to reference these people eventually. Bahaha!
But Jose will put concert inside the “tub” full of water. It’s supposed to dry overnight/one-day/whatever. I hope Ori/pals see to it these chumps don’t mess up too much.
Posted from WordPress for Android
Leave a Reply