Today’s deposit went well and I’ve finished the process from 0800-0830 a.m.
Then Dora had me adjust/create credit memos for RSL Commissions and apply those to the open invoices.
Next is the self-billing but I worked on the weekly collections.
She usually arrives 0900 a.m. and leaves 1330 p.m. I usually arrive at 0800 a.m. and leave at 1200 p.m.
Again, I like part time work and temporary. It allows me to earn some money for half a day and to be at home for when I’m needed.
For example, yesterday, I drove Mom to see her other doctor art 1500 p.m. And Dad had to stay home because Harvin Javier came to install the shower head and two faucets.
He couldn’t install our new toilet because we wanted tiles as backslash at the base where dry walls meet the floor tile.
This is in case of the toilet overflowing. We had incidences downstairs where we had the toilet overflow from, well, our huge appetites.
The jobs are done nicely. BUT their scheduling/schedule/Jason the scheduler needs to be improved. Because it costs money for workers to show-up at the job site and NOT work and when the property owners are not present.
Posted from WordPress for Android
Leave a Reply