This is only a temporary pause in today’s activity. My hair is still wet from a much needed shower.
After panicking at work today, I came home for lunch. I couldn’t identify the payments and had a difficult time figuring out how to read the backups.
The head hunter called at 0950 a.m. and asked how I was doing. I should have been honest and said that I hate working. But I rationalized that each gig offers different processes and money earned, too.
After a late lunch at 1345, the installers came at 1457 p.m. to finish the two vanities, which unfortunately still don’t line up properly.
I could see the long vanity is off and the small sink is still up against the door jamb! The sink of the long vanity is NOT lined up to the center of the two/right cabinet doors. We need two more strips of backslash for the small sink.
We don’t if/when they’ll be back. Eddie said very little to the home owners/my parents. He didn’t say anything to me or greeted me upon opening the front door to him. He’s caught just like Ori. Both have smartphones with codes from Los Angeles, by the way.
After they left at 2100 p.m., I vacuumed upstairs and the stairs. Dad hosed the front and lied to Mom about hosing the front door and the walls. The dust from the work on our front lawn blew mostly towards the direction of Loca Lolita. We had to keep the front door closed.
After Mom took a shower, I did a few more CHORES and took my shower. It’s currently 2308 p.m. and Dad is taking his shower. We still have to say the rosary off three chaplets.
For two months Eco Bxxxders took a WTF long time to finish a small bathroom and a linen closet vanity section. For 80% less and for less than two weeks worth, Filipinos can do it better.
Bah.
Leave a Reply